Language Arts Complex- Measure M:
The new IT offices at the Old CJ bldg. have been completed and the IT Department (TSS) has been moved in to their new space in preparation for future demolitions. The new Language Arts Building is in the pre-construction phase.
Classroom Improvements- Measure M:
There are currently no active Classroom Improvement projects.
Auto Technology Sidewalk Replacement Project- Campus:
Concrete pour for the curb and sidewalk continues. Painting of the exterior walls at Auto Tech continues. Construction vehicles will enter and exit campus via parking lots A and B. The roadway in parking lot B along the Auto Technology building will be closed to through traffic and pedestrians. Please be mindful of detours in these areas. The pedestrian walkway will be accessible between Auto Technology and Native Garden, and the driveway between Auto Technology and Tennis Courts will be accessible for Smog Referee Operation. The noise level will be moderate due to large trucks and equipment for these activities. (See attached map [PDF] for work areas and construction vehicle routes)
General Note:
For any additional questions or clarifications, please email Mike Golden at mgolden7@gwc.cccd.edu for Measure M projects, and Frank Fonseca at ffonseca1@gwc.cccd.edu or Joe Dowling at jdowling@gwc.cccd.edu for Campus projects.