SKIP TO PAGE CONTENT

Construction Update for Week Beginning 12/20/21

Language Arts Complex - Measure M:
Campus will be closed for the next two weeks for the Holiday break and classes will resume with Winter Intersession starting January 3, 2022. Construction activity will continue during the break with steel erection and deliveries. Steel deliveries will continue with trucks moving through Parking lot B off of Goldenwest Street and entering campus between the Native Garden and Auto Tech. This route will take them past Cosmetology and the Student Union/Cafeteria, and down Main Street to access the construction site through gates near the front of the Bookstore. Exercise extra caution around the trucks, minding the flagmen and avoiding these areas if possible. Other construction traffic will continue to enter and exit off of Goldenwest Street and move through the barricaded area in Parking Lot C, accessing the construction site via the construction gate between the Math & Science bldg. and the LRC. Please mind flagmen and parking lot barricades, and avoid this area. There is no parking within the barricades. The temporary fencing in the plaza area north of the construction site (behind the Bookstore) remains, awaiting concrete restoration. Pedestrian traffic is allowed through the plaza outside the fencing. Roads and walkways within any fenced off construction area are not accessible to pedestrian traffic; please use alternate routes to get around Campus. Exercise caution around construction vehicles and areas surrounding the construction site. Noise level will be moderate for these activities. (See attached map [PDF] for work areas and construction vehicle routes)

LRC Ductwork Replacement - Campus:
Ductwork atop the LRC will be replaced during Winter break. Watch for crane activity in Parking Lot C at the LRC and avoid this area.

General Note:
For any additional questions or clarifications, please email Mike Golden at mgolden7@gwc.cccd.edu for Measure M projects, and Frank Fonseca at ffonseca1@gwc.cccd.edu or Joe Dowling at jdowling@gwc.cccd.edu for Campus projects.

curve